• Tel: 0763-3581109

Engineering

Quality Control

Has formed a dedicated project management team covering design, planning, production, construction and after sales;
Have excellent project management personnel
Has accumulated a construction team that are in good discipline, with strong construction ability and skilled staff.
Has established a complete set of labor management system, training system and rating system.
The project selected team must complete a qualified sample to be approved before the mass production.

Quality standards

  • Has got the quality assurance certification of ISO9001:2015, and kept improving the quality management to stabilize and improve the product quality;

Product quality control

  • Raw material incoming inspection, to control the product quality from the its source;
  • Semi-finished windows and doors inspection during production, to ensure products are in accordance with the requirement before dispatching.
  • Has established the first piece to be made and inspected system, first piece sample to be produced before mass production to achieve the purpose of pre-control and quality improving.

Installation quality control

  • doors, and carry out acceptance inspection for each procedure, the next construction procedure can’t be proceeded without an acceptance on previous step.
  • Conduct monthly project inspection, to inspect the aluminum windows and doors material placement and protection on site, steel frame installation, windows and doors installation, the sealing, appearance quality, windows and doors finish products protection, material and window and door cleaning, and form a rectification report.

Quality standards

  • Has got the quality assurance certification of ISO9001:2015, and kept improving the quality management to stabilize and improve the product quality;

Product quality control

  • Raw material incoming inspection, to control the product quality from the its source;
  • Semi-finished windows and doors inspection during production, to ensure products are in accordance with the requirement before dispatching.
  • Has established the first piece to be made and inspected system, first piece sample to be produced before mass production to achieve the purpose of pre-control and quality improving.

Installation quality control

  • doors, and carry out acceptance inspection for each procedure, the next construction procedure can’t be proceeded without an acceptance on previous step.
  • Conduct monthly project inspection, to inspect the aluminum windows and doors material placement and protection on site, steel frame installation, windows and doors installation, the sealing, appearance quality, windows and doors finish products protection, material and window and door cleaning, and form a rectification report.
Has specially set up after-sales maintenance team, with full-time personnel following up the project after-sales maintenance work.
Visiting the end users quarterly to get their feedback of user experience if there’s any problems when using the aluminum windows and doors, and provide prompt action to figure out the reasons and put forward solutions to solve that problems.
QA department is responsible for inspecting and supervising the quality of the after-sale maintenance service process of the project.